XCMG Classical K
Powerful! Firm! Stable! XCMG Classical K Series
2023-07-04
Smart Manufacturing Era
XCMG Excels in the Smart Manufacturing Era
2023-07-18

Master of Wind Power Hoisting: XCA1200

  • Master of Wind Power Hoisting: XCA1200

  • Employing 12 core patents, XCA1200 all-terrain  crane can rise to the challenges in the most tough construction sites.
  • It has an 89-m-long, 7-sectioned main boom Wind Power Hoisting and a 25.3-m-long folding crane jib, comfortably satisfying needs of hoisting any wind power turbines of up to 2.5MW. While performing a superlift operation, the lattice boom on the main boom will unfold, and then, the main boom will extend Wind Power Hoisting, and all done! That is as simple as a children’s play, and completely different from the conventional installation process from its rival cranes.
Wind Power Hoisting
  • After all things are done, the lattice boom will fold and heap up back on the withdrawn main boom, getting ready for moving to a new site. The folding structure is easy to extend and withdraw, slashing the disassembling time Wind Power Hoisting by at least 20 minutes and eliminating the need of additional hoisting devices. Therefore, 2 hours are enough for the whole process of wrapping-up, the transit efficiency increased by 20% and obviously slashing the cost of transporting to a new site.
  • The folding technology is a globally pioneering one specially developed by XCMG based on unique needs from its customers. For a hoisting operation Wind Power Hoisting in a complex construction projects, such as petrochemical construction, bridge building and steel structure erection, only outriggers are to be replaced and an eighth section of crane jib added. The 8-sectioned main boom extends 102 meters at full length.

 

  • Truss-type Y-shaped superlift device, a much larger Wind Power Hoisting resistance performance, a large side-loading resistance performance; six mechanical drives together with a hydraulic drive of large reduction ratios; a gradeability of up to 38% while loaded with a wind power crane jib, superlift devices and outriggers …… all these phrases are exact descriptions of value-yield curves for customers.

  • Before its market launch, XCA1200 all-terrain crane had withstood destructive tests for 2 years against the testing standards for a 15-year-long service life and various extreme operating conditions. XCMG Wind Power Hoisting engineers from technology, marketing and quality inspection departments had refined each aspect of XCA1200 crane throughout the whole process of repeated trials.

Case Recommend

XCMG Crawler cranes work for M...

XCMG Large tonnage cranes in t...

XCMG Cranes at the National St...

XCMG Cranes at the shipyard in...

XCMG Cranes in the site of Eri...

XCMG Cranes at the Apapa port ...

0
希望看到您的想法,请您发表评论x
Chat with us
Chat with us
Questions, doubts, issues? We're here to help you!
Connecting...
None of our operators are available at the moment. Please, try again later.
Our operators are busy. Please try again later
:
:
:
:
Have you got question? Write to us!
:
:
This chat session has ended
Was this conversation useful? Vote this chat session.
Good Bad