In recent years, as clean energy sector grows, especially a booming wind power segment, China had been the world’s largest wind power market by 2017 for 9 consecutive years.
Due to excessively demanding requirements of treacherous operation settings on products, wind farm installation has long been an industry of both high risks and high rewards. Installation equipment must meet more than one higher requirement: large hoisting capacity, strong wind resistance, higher site adaptability, convenience in site change and higher efficiency.
【Unrivaled Operation Efficiency】
According to industry insiders, QAY1200A had installed nearly 100 wind turbines in total in a short span of 10 months, setting a way far record for the sector since its boom in 2008.
Besides, it also leads to a lower transportation cost, as only 5 flat-bed trailers are enough for the job of transporting all the components all at once.