The wind power installation project used the special working conditions with great difficulty, which was greatly different from the working condition using main arm hoisting. The 2.0MW wind turbine’s actual parameters reach the international standard of 2.5MW wind turbine. Either the hoisting height and engine-room weight posed great challenge against the XCMG QAY1200A all-terrain crane.