


The 4,000t crawler crane of XCMG worked in the Duqm Oil Refinery project of Oman Oil. In the three-month construction period, 15 parts need to be hoisted by the crane, with the smallest part weighting 300t and the largest one weighing about 1,200t.
The perfect performance of XGC88000 crawler crane in Saudi Arabia aroused great attention of Oman Oil. Local staff of Oman Oil in Saudi Arabia quickly came to the project constructor SINOPEC Hoist & Transport Corporation, hoping XCMG’s 4,000t crane, immediately after finishing its work in Saudi Arabia, can make operations in Oman.
The operation coincided with the global pandemic of COVID-19. To ensure the success of the project, XCMG’s construction and service staff, while protecting their own health and overcoming many difficulties such as border entry/exit, reached the construction site in time and worked perfectly, gaining great praise from the project owner in Oman.